The request for funds was made Nov. 25 after the needed repairs were uncovered during recent inspections. The KHRC granted the full cost, which Churchill Downs placed at $103,250.
The request for funds was made Nov. 25 after the needed repairs were uncovered during recent inspections. The KHRC granted the full cost, which Churchill Downs placed at $103,250.